green offices in the philippines

Filinvest’s signature commercial development, designed by Crone Architects, is full steam ahead under construction in the Philippines. The site is located at Filinvest City, Alabang and has a total GFA of 180,000m2. Filinvest aim to complete the basement parking, ready for use by June 2016 and the target completion date for Tower 1 is June 2017. The development which includes 4 BPO (Business Process Outsourcing) towers, car parking, civic park and F & B retail, is due for completion 2022 and targets a LEED Gold Environmental Rating, through the US Green Building Council.

The concept, resembling a butterfly shape in plan, assembles 4 towers around a central park and retail hub creating a quiet respite for the North Cyberzone Business Park community.

150930_construction

140724_Top Angle Render

james bond house cebu

The Concept Design for the James Bond House was originally designed in Oct 2014. The brief was an architects dream come true. Unlimited budget, challenging sloping site in Cebu, young edgy and stylish clients with the desire to create a modern, minimalist box for their home. The resulting design is in stark contrast to the Spanish villa vernacular of the Cebu Hills area but sensitive to the topography of the land and the environment. From the projects onset, the clients were on-board with our vision, excited by the design and loved the architectural style that we were proposing. It made you feel pretty damn good about being an architect and thoroughly enjoying the collaborative Design Process. Typically, this kind of smooth design process, just doesn’t happen. But sometimes dreams don’t fully come true and need a little bit of Value Management. Not a bad thing in the scheme of things but essential to turning the vision into reality.

We were very happy to hear this week the project is forging ahead and following review of the local architects drawings pleased to see the Design Intent was respected in the modifications to the Schematic Design.

Looking forward to seeing this one progress.

L1 and L2 Family External render night

141211_p1 141211_p2

yeung sketches

aqualand’s “lindfield village” sales fury

Aqualand’s signature residential development named “Lindfield Village”, has experienced extraordinary high sales since its launch earlier this month. A sales fury, occurred during the opening Saturday of the marketing campaign, with over 90% of the 88 apartments sold within 2 hours. Over 100 apartments have now been sold and the investor and home owner market is nervously waiting for the final trench of 40+ apartments to be released. The fast sales are testament to a successful collaborative design alliance between Crone Architects and the Aqualand Development team. Good design, perfect location and a highly professional marketing campaign have proven a winning combination.

Some images below of the Development.

1059_Aqualand_Lindfiled_OverallStreet_360_SML_04 1059_Aqualand_Lindfiled_Courtyard_220_SML_04 1059_Aqualand_Lindfiled_BuildingToView_30_SML_05 1059_Aqualand_Lindfiled_Facade_60_SML_05

lindfield village launch

Aqualand launched their first, signature project in Australia, Lindfield Village, to a packed and buzzing audience last night. The marketing suite opens this weekend and the expectation is the first roll out of 88 apartments will be sold by the end of the weekend! Better get in fast. Sydney’s under supply of residential dwellings, Leading Design by International Architects Crone Partners and the sites premier location close to a railway station, parks and convenience shopping, make this development extremely attractive to both local and overseas buyers.

1059_Aqualand_Lindfiled_OverallStreet_360_SML_04

20140115_Lindfield_Bathroom_v1[12] 20140115_Lindfield_RetailEntry_v2[15]

20140115_Lindfield_A702_v1[14] 20140115_Lindfield_A707_v1[9]

 

 

 

180b time lapse photography

I love time lapse photography. This is a video showing time lapse photography of 180B under construction from Sept 2013 to Jan 2015. Watpac Constructions setup the camera on a building adjacent to our site. 180B is a 34 level commercial office tower designed by Crone Architects in 2012 and located in Brisbane, Australia. It is a 6 Star Green Star Sustainable Development designed for Japanese developer Daisho, due for completion in Nov 2015.

180B Time Lapse Photography

WatpacAnnSt_20150131_1210