Manila Tower
2018 — Design Development The 40 storey development was designed as a series of stacked boxes, with interconnecting links that became 2 story loft apartments with terraced gardens. The building includes apartment and serviced apartments with 8 levels of podium car parking. Sustainability was an important focus in the design of the facades. An “egg ...
180B Ann Street Brisbane
2011-2014 — Construction Complete 34 Level A grade commercial tower located in Brisbane. Project Cost $270m. NLA 60,000m2. 6 Star Green Star certification. My role was Design Director during the design phases of the project. I coordinated the Design Team and presented to the client various packages of work including, Building Envelope, Faç...
Mandani Bay Master Plan, Philippines
2014+ — Stage 1 Design 20 Hectare foreshore Master Plan located in Cebu, Philippines. GFA 1,200,000m2. Residential, Commercial, Park Land, Retail Shopping Centre, Foreshore Promenade and Car Parking. My role is Project/ Design Director, securing project, fee negotiation, design, coordination of documentation, workshop sessions in Cebu and presentations to the client. Client Hongkong Land ...
128 Nivel Hills, Philippines
2013-2014 — Construction Two multi-level Premier Grade residential towers located in Cebu, Philippines. GFA 71,000m2. 550 high end apartments, retail and car parking. My role was Project/ Design Director, securing project, fee negotiation, design, coordination of documentation, workshop sessions in Cebu and presentations to the client. Client Diamond Hiland Inc. Crone architects
Project MEGABLOCK, Philippines
2013-2014 — Under Construction Four tower, multi-level BPO commercial and retail development, Alabang, Philippines. GFA 175,000m2. Typical Floor Plate GFA 2,000m2. My role was Project/ Design Director, securing project, fee negotiation, coordination of documentation, workshop sessions in Manila and presentations to the client. Client Filinvest. Crone architects
Taft East Gate, Philippines
2013 — Under Construction Masterplan with 4 residential towers located in Cebu, Philippines. GFA 225,000m2. 4,000 mid-level grade apartments. My role was Project/ Design Director, securing project, fee negotiation, design, coordination of documentation, workshop sessions in Cebu and presentations to the client. Client TAFT Property Venture Capital. Crone architects
The Alcoves, Philippines
2014 — Design Development & Marketing Multi-level Premier Grade residential towers located in Cebu, Philippines. GFA 60,000m2. 460 high end apartments, retail and car parking. My role was Project/ Design Director, securing project, fee negotiation, design, coordination of documentation, workshop sessions in Cebu and Manila and presentations to the client. Client AYALA Land Premier. ...
Telstra Office Tower & Retail, Sydney
Telstra Office Tower & Retail 1996-1999 — Construction Complete Project cost $170 million. 30 level office tower. My roles included design and documentation of the facades for the tower and podium areas. I worked from concept design through to construction documentation. My primary focus was the design and documentation of the Sydney Arcade retail ...
Ernst & Young Centre, Sydney CBD
Ernst & Young Centre, Sydney CBD 2001-2004 — Construction Complete Project Cost including retail $270 million. 32 level A grade office tower. GFA 135,000m2. 4.5 Star NABERS rating. My role was Project Architect/ Designer of the facades for the tower and podium. The role included work on the change of use design competition for the ...
12 Help Street, Chatswood
2015+ — Feasibility Feasibility Study for prime residential and commercial development located in Chatswood. GFA 36,300m2. 270 apartments over 38 levels including 10,000m2 of podium commercial & retail. My role was Project Director, securing project, fee negotiation, design, strategy for maximising the sites potential, coordination of documentation, engagement of planner and presentations to the client ...
Arya Residences, Philippines
Two multi-level Premier Grade residential towers located at Fort Bonifacio Global City near Makati City. GFA 76,000m2. 640 Apartments. LEED Gold & BERDE sustainability ratings. My role was Project Director, securing project, fee negotiation, design, coordination of documentation, workshop sessions in Manila and presentations to the client in the Philippines. Client ArthaLand. ...
275 George Street, Brisbane
275 George Street, Brisbane 2006–2008 — Construction Complete Project Cost $140 Million. GFA 41,000m2. 33 level PCA “Grade A” office tower in Brisbane. 4.5 Star NABERS & 5 Star Green Star Design and As Built certification. My role was Project Architect and Façade Designer. My role changed to an advisory role directing the managing architect during Construction ...
Sky Vue, Sydney.
Sky Vue, Sydney. 2005–2009 — Construction Complete Project Cost $60 Million. 12 level A grade office tower with internal glazed atrium and heritage façade on George Street. GFA 18,000m2. My role was Project Architect and I worked through the detail design of facades, internal atrium, glass lift enclosures and shop fronts. I provided ...
Bankstown Central, Bankstown
2016+ — Planning Proposal & Concept DA Mixed-use masterplan project in Bankstown. The development includes residential, commercial, aged care, independant living units, education and innovation hub, student housing and hotel. My role was Project Principal, fee negotiation, design, strategies for maximising the sites potential, coordination of documentation and presentations to the client in ...
333 Kent Street, Sydney
2015 — Competition Design Excellence Competition for Sydney City Council, site located in Kent Street, Sydney. GFA 20,000m2. 70 high end apartments, 200 room hotel, retail and car parking. My role was Project/ Design Director, securing project, coordination of design team & consultants, presentations to the client and council. Client Maville Bay. Pty. Ltd. Crone ...
Aurora Place & 155 Macquarie Street
Aurora Place & 155 Macquarie Street 1999-2000 — Construction Complete Project cost $200 and $70 million respectively. Group GSA were commissioned to document both the residential and office towers designed by Renzo Piano Building Workshop (RPBW). My role was to manage the Design Development documentation for the penthouse apartments located on roof levels 16 to 18. I ...
Mount Hagen Urban Master Plan Projects, Papua New Guinea
2010 — Tender Engaged by the Western Highlands Provincial Government to provide Master Plans for the Mount Hagen City Precinct, Airport Precinct, Sports Precinct and a number of key Infrastructure Projects. Total GFA 160,000m2. Crone Partners were Lead Consultant engaging all consultants and managing the process. The Mount Hagen City Precinct included ...
333 George Street, Sydney
2009–2010 — Development Application Project Cost $60 Million. GFA 19,000m2. 13 level A grade office building. Designed to DA level for refurbishment option re-using existing structure and lift-core. 4.5 star NABERS & target 5 Star Green Star rating. My role was project architect, façade design, coordination of consultants, advising and managing the documentation team and presentations ...
One Serendra, Makati City Philippines
One Serendra, Makati City Philippines 2006 — Construction Complete Two multi-level residential towers located in the Philippines. The towers are 48 and 52 levels located in Fort Bonifacio Global City. GFA 90,000m2. Total of 600 apartments including a “Garden Bridge” residential building spanning between the 2 towers. My involvement was design and management of the project ...
Hassall Street Parramatta Competition, Sydney
Hassall Street Parramatta Competition, Sydney 2008 — Competition Project Cost $80 Million. 20 level office tower Design Competition. My role was design and management of the Design Submission. I was involved in presentations to the client and Parramatta City Council’s Design Advisory Committee. Client Grosvenor. Builder Leighton Constructions. Crone architects
Boroko, Papua New Guinea
2009–2010 — Tender 5 level A Grade office development designed around internal atrium. GFA 6,500m2. Target LEED Silver rating. My role was Project Architect, Designer, coordination of consultants, Management of documentation team, developing the design from Concept through to Planning Approval stages. Client Nambawan Super.